北京遼寧企業商會
Beijing Liaoning Enterprise Chamber of Commerce

手机看舟山体彩飞鱼:海外礦產冶金領域的合作項目

 

舟山飞鱼走势图 www.zpahd.com

№ п/п

Project title

項目名稱

Note

備注

1

Construction of copper smelter plant with capacity of 300,000 tons of copper cathode

建產能為30萬噸陰極銅的煉銅廠

Investor is required Required.

需投資方

2

Construction of a metallurgical plant on the basis Masalsky iron ore deposit in Akmola region

在阿克莫拉州以馬薩里(音譯)鐵礦產地為基礎建鋼鐵廠

Probable reserves - 1 billion tons of ore.

Required funding for the project or partner for joint implementation on  possible scheme: 80% of the loan, the investor 20%

預測儲量為10億噸鐵礦石。

項目需融資或合作伙伴,可按如下模式合作實施:貸款80%,投資方20%。

3

Modernization of JSC "ArcelorMittal Temirtau" with production of high-quality steel grades in Temirtau, Karaganda region

股份公司現代化改造 -- 生產高標號鋼材

鐵米爾套市,卡拉干達州

Increase of capacity to 6 million tons per year.


Borrowed funds are required

擴產至600萬噸每年,需貸款

4

Industrial development of Shalkiya polymetallic deposits in Kyzylorda region with the construction of the metallurgical complex

對克孜勒奧爾達州沙爾基雅(音譯)多金屬礦石產地進行工業開發并建冶金廠

There is a project feasibility study and  design and  estimate documentation. The deposit is ranked 7th in the world  with 6.5 million tons of zinc reserves and  1.7 million tons of lead reserves

項目有可研和設計預算資料。按鋅(650萬噸)和鉛(170萬噸)的儲量,該礦產地居世界第七位。

5

Construction of a metallurgical plant for processing of cobalt-nickel ore of the  "Gornostayevskoye" field in

East Kazakhstan region

在東哈薩克斯坦州建冶金廠加工“戈爾諾斯塔耶夫斯科耶(音譯)”礦產地的鈷-鎳礦石

Reserves compromise 32 million tons of ore containing 244,000 tons of nickel and 16,000 tons of cobalt.

Production capacity - 1.9 million tons of ore per year.
Project funding is required. Company proposes to carry out the project to Appendix 1.

儲量為3200萬噸礦石,含鎳24.4萬噸,鈷1.6萬噸。                                                                                            產能為每年190萬噸。                                                                                                                     項目需融資。該公司建議將此項目移至附件一。

6

Syrymbet production of tin

斯雷姆別特(音譯),生產錫

Joint Ore Reserves Committee report, Metallurgical report from SGC Canada

聯合委員會已出礦石儲量報告,加拿大SGS公司已出冶煉報告。

7

Development of Benkala and South Benkala copper deposits  in Aktobe region

開發阿克糾賓州本卡拉(音譯)和南本卡拉銅礦

Funding scheme: Capital Investments (preferably).We are prepared to consider convertible or long-term loans. Project documentation: Project documentation in accordance with   requirements of the Republic of Kazakhstan, Project of SX-EW plant is developed by Calder Engineering (Australia) and adapted to the standards of Batys Engineering of the Republic of Kazakhstan. Geological reports under JORC standards prepared by Wardell Armstrong International.

融資模式:資本投資(最優選擇)??梢鑰悸歉《幕虺て詰拇?。項目資料:符合哈薩克斯坦要求的設計文件,SX-EW工廠設計由澳大利亞Caldera Engineering完成并轉而符合哈薩克斯坦“巴迪斯(音譯)工程”的標準,Wardell Armstrong International完成JORC標準的地質報告。

8

Mining complex in Kargaly Aktobe region

在阿克糾賓州卡爾加雷(音譯)建選礦廠

Production is carried out since 2008. Inventories - up to 1 billion tons of ore possibility of production of titanium and vanadium.
Investor and  loan funds are required

2008年清算后開始生產產品,最高可產10億噸礦石,可產鈦和釩等。

需投資方或貸款。

9

Production of longitudinal welded pipes

生產直縫管

The project for the production of longitudinally welded pipes with diameter of 20-219 mm for gasification. Feasibility study is not ready.

直縫管生產項目,直徑20-219mm用于氣化??裳形賜瓿?。

10

A line for production of electrolytic aluminum with capacity of 250,000 tons per year, Pavlodar region

年產25萬噸電解鋁生產線,巴甫洛達爾州

Project is included in Appendix 1

該項目已列入附件一

11

Production line with  capacity of 3 million tons of steel per year

年產300萬噸鋼的生產線


12

Transfer metallurgical plant,

South Kazakhstan region

鋼廠轉移,南哈薩克斯坦州

Establishment of mining and processing complex, construction of direct-reduced iron (facility) as per innovative technology of casting-rolling plant. Implementation Period: 2015 - 2017. Obtaining a license is required for development of Abail iron ore deposit. Anhui company is prepared to consider the possibility of transferring one of its plants with capacity of about 1.5 million. Tons in Kazakhstan (plant was closed due to urban plan change in its current location). Business plan and feasibility study on the development stage. Plot of land has been allocated in the industrial zone of South Kazakhstan region

建設選礦綜合體,建設按創新技術直接復原鐵的裝置和鑄軋廠。實施時間:2015-2017年。需辦理阿巴伊(音譯)鐵礦的采礦權。安徽公司愿考慮將自己產能約為150萬噸的一個廠轉移至哈薩克斯坦(該廠因城市建設規劃改變而被原址關停)。商務計劃和可研正在制訂階段。在南哈州產業園內已劃撥了土地。

13

Construction of  steelmaking plant, South Kazakhstan region

建鑄鋼廠,南哈州

Business plan and feasibility study on the development stage. Plot of land has been allocated in the industrial zone of South Kazakhstan region

商務計劃和可研正在制訂階段。在南哈州產業園內已劃撥了土地。

14

Organization of production of steel pipes, North Kazakhstan region

組織直縫鋼管的生產,北哈州

Design; construction of communications; constructions of administrative building, construction of storage facilities; construction of a workshop for  production; construction of access railways; production; sales. Implementation period: 3 years. Markets for products / services: Kazakhstan, Siberia, Altai and East regions of Russia,  Republics of Central Asia.

設計;通信建設;行政樓建設,倉庫建設;生產車間建設;鐵路支線建設;生產;銷售。實施時間:3年。產品/服務的銷售市?。汗慫固?,俄羅斯的西伯利亞、阿爾泰和東部地區,中亞各國。

15

Production of barite concentrate on the Ansay field in Kentau, South Kazakhstan region

在南哈州肯套市安塞(音譯)礦產地生產精重晶石(硫酸鋇)

Business plan and feasibility study on the development stage. Plot of land has been allocated in the industrial zone of South Kazakhstan region. Required investment - 80%

商務計劃和可研正在制訂階段。在南哈州產業園內已劃撥了土地。需投資:80%。

16

Production of steel billets, 530,000 tons per year

生產鋼錠,年產53萬噸

1. Land is determined with infrastructure supply
2. The largest consumer in the face of rail and structural steel plant

1.土地已確定,可奠定基礎設施;

2. 以鋼軌鋼梁廠為代表的大用戶。

17

Organization of production for anti-corrosion protective coatings on steel structures and other metal products by hot-dip galvanizing in Atyrau region

組織關于用熱鍍鋅方法為鋼結構和其他金屬制品上防腐層的生產,阿特勞州

Model funding due to distribution of investment shares between parties still have not been recorded. Availability and content of Chinese participation in project: Wuchuang company is comitted to supply equipment, installation, commissioning, staff training and technology transfer hot-dip galvanizing.

融資模式:各方投資份額分配尚未明確。項目有并包括中方的參與:Wuchuang負責供應設備、安裝、調試、培訓人員和轉讓熱鍍鋅技術。

18

Establishment of mining,chemical and metallurgical complex on the basis of "Tymlay" titanomagnetite deposit in Zhambyl region

在江布爾州以“德姆來(音譯)”鈦磁鐵礦產地為基礎建立礦產化工冶金綜合體

Completion on the development of feasibility study. Participation initiator 120 mln.USD, innovative technologies, subsoil usage rights. Production technology is developed, first products have been received which exceed the performance characteristics of GOST.

可研正在完成。倡議方出資1.2億美元,創新技術,采礦權。制訂了生產工藝,得到了第一批產品,指標超過了國家標準。